We are happy to bring you this update on our Ennis Public Safety Facility!
On the outside of the building, metal studs and roof decking are nearing completion on the main building. Roofing and exterior waterproofing will begin within the next week. Project Manager Nathan would like to thank our subs, Rice Drywall, Structural Fabrications Inc, and DMG Masonry for their work to date.
Inside the building, metal ductwork is being installed by Travis Mechanical, electrical runs are being installed by Intex Electric and metal stud walls are being started by Rice Drywall. Roof drains and copper piping are being installed by Curl’s Plumbing. This 38,000 SF facility was designed by RBDR Architects.